VLSI MARKET NEWSROOM

Built to be cited.

A press-facing desk for source-linked foundry and startup-capital facts, scope-aware comparisons, downloadable data, and direct controlling documents. Every number keeps its period, unit, reporting basis, and evidence status.

CAPITAL INTELLIGENCE RELEASE

Open semiconductor funding graph

The startup monitor now connects each covered investment disclosure to investors named in its controlling public announcement. Financing-event participation and company-level capital-backer disclosure stay separate; neither implies check size, ownership, board rights, current mandate, or a complete portfolio.

STARTUP RECORDSExplore →

Current company investment disclosures

4040 tracked companies

Each record remains attached to its financing-event or company-capital-backer scope and controlling announcement date.

NAMED ENTITIESSearch →

Searchable investor entities

20738 company records name an investor relationship

Names and roles reproduce the round-level disclosure without inferring an investor's wider portfolio.

PARTICIPATIONSAPI ↗

Source-linked named relationships

2442 records explicitly retain nondisclosure

Missing names and individual check sizes stay undisclosed rather than becoming zero.

STORY LEADS

Official facts worth opening

These are reported or transparently scoped observations, not recommendations. Open the controlling source before publication and preserve the evidence label in any secondary chart or article.

reportedSource ↗

Tower Q2 2026 revenue

US$460M+24% YoY

Gross profit was US$138M; Q3 revenue guidance is a separate US$520M midpoint with a ±5% range.

reportedSource ↗

TSMC Q2 2026 revenue

US$40.20B+33.7% YoY

Gross margin was 67.7%, operating margin 60.3%, and 2nm represented 3% of wafer revenue.

scope alertSource ↗

Intel Foundry Q2 scope

US$5.8B+31% YoY

The operating-segment total includes intersegment transactions and is not ranked with pure-play company revenue.

reportedSource ↗

UMC Q2 2026 revenue

NT$68.73B+12.6% QoQ

Utilization was 85%, 22/28nm represented 37% of revenue, and wafer shipments rose 10.6% QoQ.

reportedSource ↗

TSMC FY2025 revenue

US$122.42B+35.9% YoY

Advanced technologies reached 74% of wafer revenue; 3nm alone was 24%.

reportedSource ↗

SMIC FY2025 shipments

9.697M+20.9% YoY

Standard-logic 8-inch-equivalent wafers; revenue rose 16.2% while ASP fell to US$907 per equivalent wafer.

scope alertSource ↗

Intel Foundry scope gap

US$0.307Bexternal subset

The US$17.826B segment total consists substantially of intersegment manufacturing revenue.

reportedSource ↗

GlobalFoundries shipments

2.345M+10% YoY

Reported 300 mm-equivalent wafer shipments for FY2025.

TECHNOLOGY WATCH

Milestones with evidence status

Technology announcements can explain a cycle but do not prove revenue, yield, customer volume, or market share. Reported milestones and forward guidance remain distinct in this feed.

CompanyPeriodMilestoneEvidenceEditorial contextSource
TSMCQ2 20262nm entered the reported wafer-revenue mixreportedTSMC reported 2nm at 3% of Q2 wafer revenue; the process mix is company-specific and is not a foundry market-share estimate.Official document
Intel FoundryQ2 2026Intel 18A-P entered risk productionreportedThe earnings release describes the milestone as risk production, not customer volume, yield, revenue, or high-volume manufacturing.Official document
Intel FoundryQ2 2026A subset of Panther Lake entered high-volume manufacturingreportedIntel limited the statement to a subset of Core Ultra Series 3 processors and did not disclose external-customer wafer volume.Official document
UMCJul 2026 approvalSingapore cleanroom and Tainan fab expansion approvedguidanceUMC approved phased Singapore P4 cleanroom/tool expansion and a new Tainan building shell; the revised FY2026 capex budget is US$2.0B guidance.Official document
TowerJul 14, 2026Japan SiPho, SiGe and optical-packaging expansion announcedguidanceTower described a dual-track plan with Q4 2027 production readiness for the first track and a multi-fold capacity target for the second; both remain forward-looking.Official document
TSMCQ4 20252nm entered high-volume manufacturingreportedTSMC reported good yield and expects a fast 2026 ramp; N2P and A16 remain scheduled for H2 2026.Official document
Samsung FoundryQ3 2025First-generation 2nm GAA mass production startedreportedRevenue remains undisclosed, so technology progress is not converted into a market-share estimate.Official document
Intel FoundryFY2025Intel 18A ramped into high-volume productionreportedIntel identifies 18A as its first significant node for government and enterprise foundry customers.Official document
SMICDec 2025Monthly capacity passed 1M 8-inch-equivalent wafersreportedYear-end monthly capacity reached 1,058,750; FY2025 shipments rose 20.9% to 9.697M on the same basis.Official document
Tower2027 targetSilicon-photonics capacity targeted above 5× Q4 2025 run-rateguidanceThe target is guidance backed by a stated US$920M SiPho/SiGe investment program, not current capacity.Official document
PRESS KIT

One dataset, reusable formats

Use the full extract for exploratory analysis or request one dataset and company at a time. Unavailable values carry a status and reason; their numeric field remains blank rather than zero.

CITATION

Suggested dataset citation

Retain the title, data-through period, publisher, publication date, and URL.

VLSI Market, “Global Foundry Monitor,” data through Q2 2026 latest results · FY2025 annual baseline, published August 5, 2026, VLSI Korea, https://market.vlsi.kr/foundry.
SCOPE ALERT

Intel and Samsung require separate treatment

Intel Foundry segment revenue principally reflects intersegment manufacturing. Samsung does not report standalone Foundry revenue. Neither should appear as a directly comparable pure-play revenue observation.

Read the full comparison rules →
DATA OPERATIONS

Release watch and validation

The watch checks for official publication changes. A daily check does not mean a company published a new observation that day; the last validated snapshot remains available when an upstream document fails.

ACTIVE POLICY

TSMC and UMC monthly revenue

Daily source watch; ingest after official monthly release

Re-fetch current and prior month when a release changes
ACTIVE POLICY

All covered foundry company results

Daily filing watch; ingest only after an official result or exchange filing appears

Reconcile quarterly presentation, annual report, and SEC/HKEX filing
ACTIVE POLICY

VLSI Market normalized foundry layer

Schema, units, scope, duplicate, range, and source-link checks before publish

Retain the last validated snapshot when an upstream document is unavailable
SOURCE DESK

Primary documents

Open the original filing or result alongside the VLSI Market extract. The official definition controls whenever a summary and source appear to differ.

Samsung Electronics

Samsung 4Q & FY2025 Results

Audited financial statements, earnings releases, presentations, and management commentary

Open official source ↗
Taiwan Semiconductor Manufacturing Company

TSMC 2025 Annual Report

Audited revenue, wafer shipments, annual capacity, process mix, customer count, and technology milestones

Open official source ↗
Taiwan Semiconductor Manufacturing Company

TSMC 2Q 2026 Results

Q2 2026 revenue, margins, wafer shipments, and process-node revenue mix

Open official source ↗
Intel Corporation / U.S. SEC

Intel 2025 Form 10-K

Intel Foundry segment revenue, third-party external revenue, operating result, and process milestones

Open official source ↗
Intel Corporation / U.S. SEC

Intel Q2 2026 Earnings Release

Q2 2026 Intel Foundry segment revenue and Intel 18A-P / Panther Lake manufacturing milestones

Open official source ↗
GlobalFoundries

GlobalFoundries FY2025 Results

Annual and quarterly revenue, margins, cash flow, and 300 mm-equivalent wafer shipments

Open official source ↗
United Microelectronics Corporation / U.S. SEC

UMC Q2 2026 Results and Expansion Disclosure

Q2 2026 revenue, process mix, utilization, wafer-shipment growth, 2026 capex, and approved expansion plan

Open official source ↗
Semiconductor Manufacturing International Corporation / HKEX

SMIC 2025 Annual Report

Audited revenue, wafer shipments, 8-inch-equivalent capacity, ASP, and operating metrics

Open official source ↗
Tower Semiconductor

Tower Semiconductor FY2025 Results

Annual and quarterly revenue, profitability, capital expenditure, and specialty-platform investment

Open official source ↗
Tower Semiconductor / U.S. SEC

Tower Semiconductor Q2 2026 Results

Q2 2026 consolidated revenue and gross profit plus separately labeled Q3 2026 revenue guidance

Open official source ↗
Tower Semiconductor

Tower Japan SiPho / SiGe Capacity Expansion

July 2026 plan for 300mm silicon-photonics, silicon-germanium, and advanced optical-packaging expansion

Open official source ↗
Synopsys / U.S. SEC

Synopsys 2025 Form 10-K

Audited FY2023–FY2025 Design Automation and Design IP segment revenue and Ansys acquisition perimeter

Open official source ↗
Cadence Design Systems / U.S. SEC

Cadence 2025 Form 10-K

Audited FY2023–FY2025 company revenue, rounded product-group revenue shares, and one-operating-segment disclosure

Open official source ↗
Siemens AG

Siemens Annual Report 2025

FY2024–FY2025 Digital Industries software-business revenue and acquisition perimeter

Open official source ↗
Arm Holdings / U.S. SEC

Arm Fiscal 2026 Form 20-F

Audited FY2024–FY2026 license-and-other, royalty, and total revenue

Open official source ↗
REVISION LOG

What changed

A compact public record of material dataset and methodology releases.

Hailo status corrected to pending acquisition

Added Microchip's July 24 definitive acquisition agreement and changed Hailo from active-private to pending acquisition. The transaction remains subject to approvals and customary closing conditions; undisclosed consideration stays blank and is never converted to zero, financing, or a live valuation.

Tower Q2 2026 foundry results added

Added Tower's SEC-filed US$460 million Q2 revenue and US$138 million gross profit as actual observations. The US$520 million Q3 revenue midpoint and ±5% range remain separately labeled guidance and never enter the FY2025 pure-play ranking or a reported-sales total.

EDA scope correction and semiconductor IP layer published

Separated direct Synopsys Design Automation segment evidence from Cadence total-company and Siemens Digital Industries software context. Added Arm licensing-and-other and royalty revenue, Synopsys Design IP segment revenue, Cadence's rounded Semiconductor IP revenue share, and explicit Siemens non-disclosure. No rounded percentage is converted to dollars and no broad software metric is relabeled as EDA or semiconductor-IP revenue.

Open semiconductor investor graph published

Published 40 current company investment disclosures, 207 named investor entities, and 244 source-linked named relationships. 38 records name at least one investor relationship; the remaining 2 explicitly retain issuer nondisclosure. One company-level capital-backer disclosure remains distinct from financing-event participation. Check size, ownership, current mandate, and complete portfolio coverage are not inferred.

Startup search and source network expanded

Expanded the active-private semiconductor startup snapshot from 20 to 30 source-linked companies and added search, evidence and freshness facets, transparent match reasons, local saved lists, three-company comparison, capital timelines, and a licensed-aware research network. Debt, grants, strategic investment, equity, cumulative funding, and valuation remain separate fact classes.

Quarterly disclosures and dated launch references added

Added source-linked Samsung, SK hynix, Micron, TSMC, Intel, UMC, Synopsys, Cadence, Siemens, and Tower updates as separate quarterly or event records. Six official NVIDIA and Intel launch references now open directly in the selected-product terminal. FY2025 annual comparisons and the then-current 180-node technology taxonomy were retained unchanged.

Startup source links refreshed

Advanced ten company profiles to newer verified technology, deployment, commercialization, and governance coverage without changing any financing, valuation, or active-status field.

Official-source foundry layer published

Added FY2025 revenue, normalized wafer shipments, operating disclosures, technology signals, source registry links, CSV export, and explicit Intel and Samsung scope treatment.